Underground of public services (natural gas, electricity, telecommunications, potable water, sanitary sewage) in the Distrito Nacional

Final reception: 09/08/2021, 3:30 pm

Registration date: 08/10/2022

Project description

The initiative proposes the construction of an underground pipeline infrastructure using Horizontal Directional Drilling (HDD) technology, which is minimally invasive. The initial project will be carried out in the central area of the Distrito Nacional, delimited by the following avenues: 27 de Febrero, Winston Churchill, John F. Kennedy, and Ortega y Gasset. This initiative consists of a series of separate conduits at different depths for public services such as drinking water, sewage, electrical wiring, telecommunications wiring, and gas pipelines.

The project aims to achieve the scope and characteristics of the private initiative called "Undergrounding of Public Utilities (natural gas, electricity, telecommunications, drinking water, sanitary sewage) in the Distrito Nacional." It involves the installation of 300,000 linear meters of underground pipes with diameters ranging from 2 to 12 inches, potentially affecting an area of 4.26 km² in the central area of the Distrito Nacional Approximately 90% of the affected streets will use Horizontal Directional Drilling (HDD) technology, while the remaining 10% will involve traditional trenches. The entire construction process, including design and enabling permits, is expected to be completed within four (4) years.

LOCATION

The initiative proposes the construction of an infrastructure of underground pipes that would start with a pilot project in the Polígono Central of the Distrito Nacional.

This initiative is located in the Polígono Central and concentrates the most important economic and service area of the Distrito Nacional. With an area of 4.26 km2, it limits to the north with John F. Kennedy ave, to the south with February 27 ave, east with Ortega y Gasset ave and to the west with Winston Churchill ave.

GENERAL INFORMATION

Possible Contracting Authority(ies)

City Hall of the National District (ADN)

Contractor Authority

To be determined

Prioritized Sector(s)

Sustainable Development Goals (SDG)

Goal 6: Ensure availability and sustainable management of water and sanitation for all.
Goal 7: Ensure access to affordable, reliable, sustainable and modern energy for all.
Goal 9: Build resilient infrastructure, promote inclusive and sustainable industrialization, and foster innovation.
Goal 11: Make cities and human settlements inclusive, safe, resilient, and sustainable.
Goal 17: Strengthen the means of implementation and revitalize the global partnership for sustainable development.

Proposer

Finisterre Capital, S.R.L.

Modality

N/A

Estimated initial investment

RD$9.85 billion dominican pesos (US$179 millions aprox.) (CAPEX)

Total term of the contract

40 years

Qualification of Bidders or Manifestation of Interest

N/A

Deadline for submitting envelope A and B

N/A

Process info

Click on each icon to learn more information:

TIMELINE

Reception
09/08/2021
Admission
10/11/2021
Eligibility Workshop
11/18/2021
Declaration of Public Interest
Next process
Upcoming process
Under feasibility evaluation

PROMOTIONAL ACTIVITIES

VIRTUAL DATA ROOM

After paying the bidder qualification fees, enter this section with your username and password where you can access the preliminary studies and technical information of the project.

Remember that to generate your user you must first register by attaching proof of payment of the right of participation
and the duly signed confidentiality agreement.